Trace heating cable being installed on process pipework before insulation by Jade Insulation

Trace Heating Installation

Jade Insulation designs, installs, tests and commissions electric trace heating systems for frost protection and temperature maintenance at industrial and utility sites across the UK. Trace heating is where the company began: the Rotherham operation was founded in 2007 to design and build trace heating systems and manufacture removable insulated covers, and remains an important part of our business.

We are independent trace heating contractors, not tied to any one cable or tape manufacturer, so self-regulating, constant wattage or mineral-insulated systems are chosen in line with the application’s specific requirements. Because we also insulate and clad, the trace heating and lagging arrive as one designed system from one company, with one contract manager and one set of handover documents. Heat trace installation is delivered from our Rotherham head office and regional offices in Feltham and Taunton.

Request a Trace Heating Quotation

Trace Heating Systems

Every system is designed in line with the temperature that needs to be maintained, the lowest ambient it must cope with, the pipe size and the insulation that will sit over it. From those parameters we size the heating cable or trace heating tape, the circuits and the controls. These are the trace heating systems we design and install.

Self-Regulating Trace Heating

Self-regulating trace heating cable increases its output as the pipe cools and reduces it as the pipe warms, so it cannot overheat itself and can be cut to length on site. It is our default for frost protection of water, chemical dosing and instrument lines, and for most pipework below 65°C. At Kuraray’s Chemviron site in Durham, self-regulating trace heating under 30 to 70mm mineral wool holds process dosing tanks and pipework at +5°C with the ambient at –10°C.

Constant Wattage and Series Resistance

Where circuits are long, loads are predictable or a higher, steady output is needed, constant wattage or series resistance cable gives a known watts-per-metre regardless of pipe temperature. These systems need accurate design, because the cable will keep delivering its rated output until a thermostat tells it to stop, so we specify line-sensing control rather than ambient sensing wherever the process temperature matters.

Mineral Insulated Trace Heating

Mineral insulated (MI) heating cable, a resistance conductor inside a metal sheath packed with magnesium oxide, is the choice for higher temperatures and harsh environments. On a bitumen line at Billian UK’s Sheffield plant we used MI trace heating under mineral wool and Aluzinc cladding to hold the product at a constant 160°C, a temperature no polymer-jacketed cable could survive.

Controls, Thermostats and Distribution

Control is where heat tracing systems succeed or fail. We specify and supply local control thermostats, ambient-sensing controllers for frost protection and line-sensing controllers for temperature maintenance, with RCD protection on every circuit and distribution panels sized for the installed load; the final electrical terminations are made by the site’s or an approved electrical contractor, coordinated by our contract manager. Set points, circuit schedules and panel drawings form part of the handover pack so operators know exactly what is on the plant.

Foam & Wrap™ for Flexible Dosing Lines

Foam & Wrap™ is our own system for the trace heating and insulation of flexible chemical dosing pipework, the long, complex hose runs that water and wastewater treatment sites depend on and that conventional rigid insulation cannot follow. It was used on a wastewater treatment works phosphorus-removal scheme to trace-heat and insulate the emergency shower, hose reel feed, ferric and sodium hydroxide POA cabinets, dosing pipework and turbidity instrument, and on ferric dosing hoses at a Yorkshire wastewater site.

Book a Free Site Survey
Self-regulating trace heating cable fixed to pipework ahead of insulation Trace-heated and insulated chemical dosing cabinet at a wastewater treatment works

Frost Protection, Winterisation and Temperature Maintenance

The applications we are asked for most. Scroll across the cards; each links to the project or page behind it.

Trace-heated and insulated ferric dosing hoses at a Yorkshire wastewater treatment works

Frost Protection

Frost protection trace heating keeps water, chemical and instrument lines above freezing when the plant is exposed and the ambient drops. Self-regulating cable under insulation, ambient-sensing control and a maintain temperature of around +5°C is the standard design. At a Yorkshire wastewater works we trace-heated and insulated ferric dosing hoses and POA cabinets so they would not freeze through the winter.

Yorkshire WWTW case study →
Trace heating and insulation at Kinson Sewage Treatment Works, Bournemouth

Winterisation Programmes

Plant winterisation is a survey-led programme rather than a product: we walk the site before the cold season, list every exposed line, valve, instrument and hose reel, then trace-heat, insulate or cover each one and test the result. Industrial winterisation services across the UK run from September so the work is complete before the first frost, and insulated hose reel covers and IBC heaters are made at Rotherham for the items that move.

Bournemouth STW case study →
Mineral insulated trace heating and Aluzinc cladding on a 160°C bitumen line at Billian UK, Sheffield

Process Temperature Maintenance

Temperature maintenance holds a product at its working temperature so it flows, dose rates stay accurate and nothing sets in the line. This improves operational efficiency and reduces cost. Line-sensing control and constant wattage or MI cable are the usual tools. The Billian UK bitumen line in Sheffield, held at 160°C with mineral insulated trace heating under mineral wool and Aluzinc, is a recent example of trace heating cable installation at the top of the range.

Billian UK case study →
Foam & Wrap trace-heated insulation on flexible chemical dosing pipework

Chemical Dosing Lines

Dosing chemicals such as ferric sulphate and sodium hydroxide thicken or crystallise in the cold, and the flexible hoses that carry them cannot take rigid lagging. Foam & Wrap™ trace-heats and insulates the hose as one flexible assembly, from the POA cabinet to the dosing point. We have installed it across water and wastewater sites, including a phosphorus-removal scheme covering showers, hose reels, cabinets and instruments.

Phosphorus-removal scheme →
Trace heating installation on pipework at Huddersfield Energy and Recycling Facility

Energy from Waste and Biomass

Energy plants run outdoors and all year, so every water, condensate and chemical line needs frost protection, and many need temperature maintenance. We completed the trace heating and insulation on all pipework at the new Huddersfield Energy and Recycling Facility, and delivered the insulation and trace heating to three biomass plants built simultaneously, each with fixed milestones for first power generation.

Huddersfield ERF case study →
Insulated hot water pipework with trace heating for temperature maintenance

Hot Water Maintenance and Legionella Control

Hot water temperature maintenance trace heating keeps distribution pipework at the temperature the Legionella control regime requires without a return loop and pump: HSE guidance HSG274 Part 2 looks for 50°C or more at the outlet within a minute. Self-regulating cable rated for hot water, line-sensing control and insulation sized to the pipe deliver that on long or dead-leg runs at industrial sites, depots and plant rooms.

Discuss a hot water system →

Scroll sideways for more applications →

View Trace Heating Case Studies

Design, Installation and Commissioning

Trace heating design is carried out in-house, and the engineer who designs the system is the one who signs off the commissioning. Here is how a project runs.

  1. Survey and Heat-Loss Calculation

    We survey free of charge, or work from general arrangement drawings and P&IDs. For every line we record pipe size, length, maintain temperature, minimum ambient, insulation type and thickness, and the number of valves, supports and flanges, which add heat loss and need extra cable.

  2. Design and Specification

    From the heat loss we select cable type and output, lay out circuits within the maximum circuit length for the breaker, choose line- or ambient-sensing control and size the distribution, with design and installation to BS EN 62395 and the electrical work to BS 7671. You receive a specification, circuit schedule and budgetary price, then a formal quotation after a measured site visit.

  3. Trace Heating Cable Installation

    Cable is fixed to the pipe with the right tape and spiral pitch, end seals are fitted, and the same crew installs the insulation and cladding over it, so the trace heating and lagging are one system. Final electrical terminations and connection to the supply are made by an approved electrical contractor, coordinated by our contract manager. On water sites our operatives hold EUSR National Water Hygiene; on live plant we work under the site permit system.

  4. Testing, Commissioning and Handover

    Every circuit is insulation-resistance tested before and after lagging; once the supply is connected, we load-test each circuit, set the thermostats and witness the commissioning. Handover includes test certificates, as-installed drawings, circuit schedules and set-point records, so the plant operator knows what is installed and how to maintain it.

Request a Formal Quotation
Jade Insulation engineer commissioning a trace heating control panel

Trace Heating Installers and Contractors Across the UK

We are trace heating contractors and installers for the whole of the UK and Ireland, with teams based at Rotherham in South Yorkshire, Feltham in Middlesex and Taunton in Somerset. Demand for heat trace contractors is strongest along the south coast and the Thames Valley, and our Feltham and Taunton offices cover Reading, London, Bournemouth, Southampton, Portsmouth, Poole, Brighton and Salisbury without travel charges, while Rotherham covers the Midlands and the North.

Water utilities are our largest trace heating market. We are framework partners with Thames Water for trace heating and insulation under the General Mechanical Services Framework, national partners with MWH Treatment, and regularly deliver projects for Severn Trent, Wessex Water and Yorkshire Water. The same crews, controls and handover standards carry across to energy-from-waste, chemical, food and drink and general manufacturing clients.

Why Jade for Heat Trace

Independent System Design

Many trace heating companies sell one manufacturer’s cables or tapes. We are not tied to any, though we regularly specify Eltherm® components. Self-regulating, constant wattage or mineral insulated is chosen on maintain temperature, circuit length and environment, and the designer who specifies it commissions it.

Trace Heating and Lagging from One Contractor

The cable, the insulation, the cladding and the removable covers are designed, installed and documented together. No gap between the electrical contractor’s scope and the lagger’s, and one handover pack.

Manufactured at Rotherham

Foam & Wrap™, insulated hose reel covers, IBC heaters and removable insulated covers are made at our own facility, so winterisation programmes are not waiting on a supplier.

Trace Heating Maintenance and Fault Finding

Pre-winter inspection, fault finding and testing of existing systems: insulation resistance on every circuit, thermostat function, panel checks and lagging condition, with a report that says what will and will not survive the winter.

Accredited for Utility Sites

  • ISO 9001:2015, 14001:2015, 45001:2018
  • Achilles UVDB Verified, Silver Plus
  • Constructionline Gold, SafeContractor, SSIP
  • EUSR National Water Hygiene and SHEA Water

Projects of Every Size

A single trace-heated dosing line through to multi-site winterisation programmes and framework call-offs, on new build, planned outages and maintenance contracts. Budgetary pricing comes back quickly based on drawings or a free site visit.

Request Budgetary Pricing
Trace-heated pipework with removable insulated cover made by Jade Insulation

Trace Heating Questions

What engineers and facilities managers ask before specifying a system.

Self-regulating or constant wattage: which do I need?

Self-regulating for frost protection and most maintain temperatures below 65°C: it cannot overheat, can be cut to length and overlaps safely at valves. Constant wattage or series resistance for long circuits and steady high loads, with line-sensing control. Mineral insulated for maintain temperatures above about 150°C or where the environment would destroy a polymer jacket, as on the 160°C Billian bitumen line.

Do you install the insulation as well as the trace heating?

Yes. Trace heating only works with the insulation it was designed for, so we install both, and the cladding and removable covers over them, with the same crew. The heat-loss calculation assumes a specific insulation type and thickness; if someone else fits something thinner, the system will not hold temperature.

What is involved in trace heating maintenance?

An annual check before the cold season: insulation-resistance test on every circuit, thermostat and controller function, RCD and panel inspection, end seals and connection kits for water ingress, and the condition of the lagging and cladding. We fault-find dead or tripping circuits, report circuit by circuit and repair or replace what is needed, including systems other contractors installed.

How far ahead of winter should I order?

September and October. Winterisation programmes are survey-led, so the earlier the walk-round, the more of the site is protected before the first frost. Removable covers, hose reel covers and IBC heaters are made at Rotherham and lead times stretch once the weather turns.

What documentation do I get at handover?

Test certificates for every circuit, as-installed drawings, circuit schedules, controller set points and commissioning records, plus the insulation specification the system was designed around. That is what a plant operator needs for maintenance and what a tier-one contractor needs for the handover file.

Do you work across the UK?

Yes. Trace heating installation from Rotherham, Feltham and Taunton covers the whole of the UK, with the south coast, the Thames Valley and London served from Feltham and Taunton. We also take on work in Ireland.

Call Rotherham on 01709 761170 or Feltham on 020 3538 6490, or request a quotation online. A free site survey is the usual first step.

Request a Quotation
jade ebook

    Download Our

    Company Brochure

    Please enter your name and email to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

      Contact me regarding... Trace Heating Installation

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.