Industrial Insulation & Trace Heating for Sewage Treatment Facility, Bournemouth

Kemical Dosing Ltd supplies lime dosing plants and ancillary equipment, primarily to the water industry. They design, supply, install, commission and service their plants with a team of engineers built over the last twenty years, ensuring their turnkey projects are successful and reliable.

They have refined a dosing process that doses sewage sludge cake both constantly and consistently. This enables economical usage and process achievement, negating waste or contamination caused by additives escaping to the atmosphere.

Enquire Here
Industrial Insulation Pipework Bournemouth

Project Details

Kinson Sewage Treatment Works (STW) near Bournemouth is owned by Wessex Water and is part of the Stour catchment area, which operates multiple water recycling centres and sewage pumping stations. It treats a significant volume of sewage and contributes to the overall wastewater management in the region.

The contract managed by Trant Engineering required the supply and installation of a Liquid Lime Dosing Plant. The plant was specified to meet Wessex Water’s requirement to provide sufficient alkalinity for nitrification.

Enquire Here
Industrial Insulation Cladding Pipework Bournemouth

Our Impact & Solution

To ensure reliable and optimal operation of the plant, industrial pipe insulation and a trace heating system were required for the slurry and final effluent lines in a bunded area. Jade was appointed as the industrial insulation contractor for the project, given our extensive experience in both the water and wastewater industries. As an insulative jacket manufacturer, we were also required to supply valve jackets, along with flange jackets, to enable easy access for maintenance. These are made at our Rotherham HQ to ISO standards.

Having reviewed the drawings and specification, our solution involved designing a suitable trace heating system and choosing 30mm mineral wool for the pipework insulation. The cladding used was 0.5mm aluzinc cladding, given its mechanical strength and anticorrosive properties. Both the valves and the flanges had grey insulated jackets fitted with 50mm rockwool with velcro fastenings.

Enquire Here
Industrial Insulation Jacket Insulation

Our Work & Conclusion

  • Ensured that pipelines were protected from freezing, ensuring operational resilience no matter what the weather conditions.
  • Minimised expansion and contraction due to heat loss/gain that would put undue stress on joints.
  • Helped safeguard the plant from upstream back-ups and untreated discharges that might breach environmental permits.
  • Protected critical infrastructure from corrosion and mechanical damage. This clearly increases operating lifespan and lowers long-term operating costs.

By appointing Jade Insulation as their chosen industrial insulation contractor, Kemical Dosing ensured that their dosing plant worked effectively and efficiently, even in freezing conditions. This would ensure that Wessex maintained its services in the local area and minimised any potential environmental impact. Our services extended the lifespan of critical infrastructure, protecting Wessex Water’s investment in the Sewage Treatment Works.

Enquire Here
jade ebook

    Download Our

    Company Brochure

    Please enter your name and email to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data

      Join Our Team

      Upload your CV here.

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact me regarding... Industrial Insulation & Trace Heating for Sewage Treatment Facility, Bournemouth

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.

          Contact Us Today

          Fields marked with an * are required.

          For more details on how we handle your data, please view our Privacy Policy.