
Marine Insulation Contractors
As marine insulation contractors, Jade Insulation works for ship repairers, shipyards and vessel operators. We insulate engines, exhausts and machinery-space pipework to SOLAS, fit acoustic insulation in engine rooms, and manufacture removable insulation jackets for marine valves and flanges in our own factory in the Dearne Valley, Rotherham.
Most marine insulation work happens inside a docking or refit window. We survey and measure before the vessel arrives, manufacture removable lagging in advance, and install against the yard’s programme. Teams mobilise from our offices in Rotherham, Feltham (Middlesex) and Taunton (Somerset).
SOLAS Insulation for Engine Rooms and Machinery Spaces
SOLAS Chapter II-2 sets the fire-safety requirements behind most of the marine insulation we install. In machinery spaces, two of them shape the scope: hot surfaces must be insulated, and the insulation must not absorb fuel or oil.
Hot Surfaces and Oil-Spray Protection
SOLAS requires any surface above 220°C that could be reached by fuel or oil escaping from a failed pipe or joint to be insulated. On a diesel engine that means exhaust manifolds, turbocharger casings, uptakes and hot flanges in the spray zone. We design every system to keep those surfaces below 220°C and check surface temperatures after installation.
The outer covering has to keep oil out, so fixed insulation is finished in Aluzinc or stainless steel cladding and removable sections in a coated glass-cloth facing, with no exposed fibrous insulation. Where lagging has to come off for maintenance, we make it as removable, made-to-measure sections. Engineers can reach joints, sensors and bolts, then refit the insulation complete.
Marine Exhaust Insulation and Diesel Exhaust Lagging
As marine exhaust insulation contractors, we insulate main and auxiliary engine exhausts from the manifold, through the turbocharger, to the uptake, along with silencers, boiler uptakes and SCR housings.
Most vessels need two kinds of diesel exhaust insulation. Long straight runs and uptakes take fixed insulation with metal cladding. Manifolds, turbochargers, expansion bellows and flanged joints, which engineers open regularly, take removable diesel exhaust lagging: jackets that strap or lace on and come off without damage.
Ashore we use the same layered approach. On the CHP engine exhaust at Wessex Water’s Avonmouth Sewage Treatment Works we fitted 25mm ceramic fibre against the exhaust, 80mm wired mineral wool mat over it and 0.7mm Aluzinc cladding outside. That brought the surface down to a safe temperature, kept the exhaust gas hot for the heat exchangers and reduced noise in the CHP room. Marine diesel exhausts call for the same layered build-up, using materials approved for marine use.
We manufacture diesel exhaust lagging as well as fitting it. Each jacket is made in our Rotherham facility to measurements taken on board, so lagging is ready before the vessel docks, and the drawings stay on file for the next docking. That suits marine exhaust lagging renewals where existing jackets are oil-soaked, damaged or missing, and new lagging after an engine or turbocharger change.
Engine Room and Machinery Space Insulation
Marine engine insulation covers more than the exhaust. Steam and thermal oil lines, heated fuel lines, boilers and tanks are insulated in mineral wool under Aluzinc for heat retention and personnel protection. Chilled water and other cold lines take closed-cell elastomeric insulation with a continuous vapour barrier, so condensation never reaches the pipe.
Valves, strainers and flanges are where fixed insulation fails first. It gets cut away during maintenance and is rarely replaced. We fit removable valve insulation jackets made in our own factory, sized to each valve, with an oil-resistant outer facing for machinery spaces.
Because we also design and install trace heating, we can trace heated fuel lines and other lines held at temperature, then insulate them in the same visit.
Marine Sound Insulation and Sound Deadening
Marine sound insulation cuts the noise that travels from the engine room into accommodation, the bridge and working spaces. We install marine sound deadening on engine room bulkheads and deckheads, and acoustic lagging on exhausts and pipework, where the noise starts.
Acoustic linings in machinery spaces face the same fire and oil requirements as thermal insulation, so we specify marine sound proof insulation approved for the space it goes into rather than a building product.
On existing vessels, marine noise insulation and marine sound dampening start with the noise sources. Treating the source works: on the Avonmouth CHP exhaust, the layered insulation that brought the surface temperature down also reduced noise in the CHP room. We identify where treatment will have most effect, including work towards the limits in the IMO Code on Noise Levels on Board Ships.
Fire Divisions
We install insulation to A-60, A-30 and B-15 fire divisions on bulkheads and decks, using systems approved for the division and for the steel or aluminium structure they protect.
Approved Materials and Certification
Insulation in SOLAS applications must be approved for marine use. On EU-flagged vessels that means MED wheel-marked products; on UK-flagged vessels, the Red Ensign mark under the Merchant Shipping (Marine Equipment) Regulations. We specify approved materials for the vessel’s flag and class, and hand over material certificates with the installation records.



Related Services
Marine work draws on the same manufacturing and installation teams as our industrial services.

Removable Insulation Jackets
Made at our Rotherham facility for valves, flanges, pumps and instruments, including marine valves and exhaust joints.
Removable valve insulation jackets →
Trace Heating
Designed, installed, tested and commissioned by our own engineers, and insulated by the same team.
Trace heating installation →
Power Generation
Generator exhaust, HRSG and turbine insulation on power plant ashore, using the same high-temperature systems.
Industrial insulation contractors →Scroll sideways for more →
Working to Your Docking Window
Docking periods are short, and insulation often sits on the critical path. A contract manager runs every job from survey to handover, and our NVQ-qualified crews work to your dates and the yard’s programme.
-
Survey
On board, alongside or in dock, we measure exhausts, valves and flanges and record the condition of existing insulation. GAs or 3D models speed this up where available.
-
Manufacture
Removable jackets and exhaust lagging are made in Rotherham before the vessel docks.
-
Install
Our teams fit fixed and removable insulation to the yard’s programme, working around other trades in the engine room.
-
Hand Over
Material certificates, installation records and photographs go to the superintendent, ready for class and flag surveys.
We mobilise to UK ports and shipyards from Rotherham, Feltham and Taunton.
Request a Formal Quotation
Jade Insulation and EMS Industries
Jade has designed, manufactured and installed insulation since 2007, from our head office and manufacturing facility in the Dearne Valley. Our marine work is delivered with our affiliate EMS Industries.
That gives a ship repairer one contractor for three things usually bought separately: SOLAS insulation, removable jackets made in our own factory, and trace heating, with one specification, one contract manager and one handover pack. The same teams carry out generator exhaust insulation on power plant ashore, and the wider work of our industrial insulation contractors covers boilers, vessels and tanks across UK industry.
Accreditations and Approvals
Management Systems
- ISO 9001:2015 Quality
- ISO 14001:2015 Environmental
- ISO 45001:2018 Health & Safety
Procurement & Supply Chain
- Achilles UVDB Verified, Silver Plus
- Constructionline Gold
- Alcumus SafeContractor
- SSIP
Site Operatives
- CSCS cards
- Level 2 and Level 3 NVQs in Thermal Insulation
- CCNSG safety passports
- SMSTS / SSSTS supervisors

Frequently Asked Questions
The questions superintendents, ship repairers and yard buyers ask before shortlisting a marine insulation contractor.
Is your marine insulation SOLAS compliant?
Yes. We design machinery-space insulation to SOLAS Chapter II-2: surfaces above 220°C insulated, oil-impervious outer coverings, and approved non-combustible materials. We specify MED wheel-marked or UK MER Red Ensign products to suit the vessel’s flag, and hand over material certificates with the installation records for class and flag surveys.
Can you insulate engines and exhausts to the SOLAS 220°C surface-temperature limit?
Yes. We insulate exhaust manifolds, turbocharger casings, uptakes and hot flanges so that surfaces which escaping fuel or oil could reach stay below 220°C. Joints and components that need regular access get removable lagging, so the insulation goes back on complete after maintenance instead of being left off.
Which fire divisions can you install (A-60, A-30, B-15)?
We install insulation for A-60, A-30 and B-15 divisions on bulkheads and decks, using systems approved for each division and structure. Tell us the division, the structure and the space, and we will confirm the approved system and the certification you will receive with the handover documents.
Do you manufacture diesel exhaust lagging?
Yes. We manufacture removable diesel exhaust lagging and insulation jackets at our facility in the Dearne Valley, Rotherham. Each jacket is made to measurements taken on board, with an outer facing suited to machinery spaces. We make like-for-like replacements for existing lagging and new jackets after an engine or turbocharger change, and keep the drawings at Rotherham so replacements can be made from file.
Can you work within a dry-dock or refit window?
Yes. We survey and measure before the vessel docks, manufacture removable lagging and jackets in advance, and install to the yard’s programme. That keeps insulation off the critical path. Send your docking dates as early as possible so we can book the survey and the manufacturing slot.
Which UK ports do you cover?
We work UK-wide from offices in Rotherham, Feltham (Middlesex) and Taunton (Somerset), and send survey and installation teams to ports and shipyards. Tell us where and when the vessel will dock, and we will confirm survey dates, mobilisation and the programme for manufacture and installation.
Call Rotherham on 01709 761170 or Feltham on 020 3538 6490, or request a quotation online. A pre-docking survey is the usual first step.

